Excavator
-
Is the site cleared sufficiently to commence setting out
-
Are foundation set out in accordance with plan dimensions
-
Are foundations excavated to correct widths, length and are
bottom of trenches level
-
Was any excavation excavated too deep, if so, was it brought
to the correct level with concrete
-
Are foundation re-measurement drawings required
-
Is shoring done to satisfaction
-
Is the excavations safe guarded against flooding
-
Is material for back filling acceptable
-
Is protection against termites necessary
-
Was backfill material approved
Concrete & Reinforcement
-
Are concrete pegs in trenches to correct height
-
Was samples of sand and stone for concrete approved
-
Was the cement type approved
-
Was a slump test performed using approved material
-
Were test cubes made
-
Is shuttering adequately supported
-
Has steel been assembled and bound together correctly
-
Was steel approved by an engineer and certificate issued
-
All required sleeve pipes, conduits etc. laid in correct
-
Is steel spacing from inner face of shuttering correct
-
Is steel clean and free from grease
-
Is shuttering clean and ready to receive concrete
-
Did stripping of the formwork comply to set down stripping
-
Was concrete cured correctly without ant cracks
-
Damp proof membrane under surface bed
-
Compacted hardcore filling under floors
Brick layer
-
Is building sand clean and free of clay
-
Are bricks for foundations hard burnt bricks
-
Was facebrick samples approved
-
Were samples of bricks for foundations submitted
-
Is cement mortar of correct mix (proportionally 6:1)
-
Does the setting out of brick wall conform to plan
-
Are all joints in foundation brick work grouted solid
-
Is brick force built in at correct intervals (every 3rd
/4th course)
-
Damp proof course at floor height
-
Damp proof courses at window sills
-
Have cavity walls been bricked solid at top of walls
-
Is weep holes provided at bottom of cavity walls
-
Have roof ties been built into brick wall (at least 4
courses)
-
Has firewalls been constructed to conform to SABS codes
-
Is under-surface bed damp proof membrane of correct type
-
Flashings pointed properly and thoroughly waterproofed
Carpenter
-
Only treated roof timber to be used, if not, what
preservative has been used
-
Have wall plates been treated
-
Have wall plates been strapped and adequately anchored to
walls
-
Are pre-fabricated roof trusses used
-
Was the engineers certificate issued
-
Has roof bracing been carried out correctly
-
Are purlin and brandering spacings correct
-
Are valleys in roofs constructed correctly
-
Is timber near flues and fireplaces at least 100mm away from
flue
-
Are purlins secured to rafters with galvanized wire
-
Are ceiling boards fixed to brandering in correct manner
-
Is ceiling insulated
-
Is a trapdoor for roof access provided
-
Do doors comply to door schedule specifications
-
Do windows comply to window schedule specifications
-
Has PVC sheeting been laid over gap under ridge and hip
tiles
-
Are roof tiles securely fixed to brandering at eaves
Waterproofing
-
Has surfaces to receive waterproofing been prepared
satisfactory
-
Has the correct waterproofing been applied to flat roofs
-
Has it been performed to the manufacturers specification
-
Have corners been filleted correctly
-
Are expansion joints formed to detail
-
Is a maintenance coat of bituminous paint required on
sheeting
Metalwork
-
Are steel windows manufactured according to the window
schedule
-
Are all window fasteners and stays fitted
-
Do windows close easily and not hinged bound
-
Has all welding of joints on steel work been performed
neatly
Plasterer and tiler
-
Was plastering sand checked and approved
-
Does plaster conform to the specified mix
-
Is the thickness and finish to the plaster satisfactory
-
Is granolithic of specified mix
-
Have steps been finished neatly
-
Have metal dividing strips been provided at different floor
finishes
-
Are wall and floor tiles of a first grade
-
Are horizontal and vertical joints perfectly plumb and level
-
Has top edge of tiling been filled and finished off neatly
-
What skirting finish has been provided
Drain layer
-
Have excavations been carried out to correct depth and falls
-
Has pipes been laid to straight lines
-
Does barrel of pipes rest on solid ground
-
Are their drains passing underneath building encased in
concrete
-
Are vertical bends encased in concrete from bottom to top
-
Have drains been tested and approved
-
Have cleaning eyes and inspection eyes been installed
-
Are gullies at least 70mm above paving level
-
Have approved vents been installed correctly
-
What type if septic tank has been installed (where
applicable)
-
Was the porosity test of the soil adequate for the french
drain (where applicable)
Plumber
-
Has gutters been fitted to correct falls
-
Are down pipes secured correctly to walls
-
Is building adequately protected against lightning
-
Is piping adequately fixed to walls with appropriate
holderbolts
-
Have pans & cisterns been checked and all in order
-
Are seats firmly fixed to pans
-
Have taps been installed correctly
-
Have plugs and chains been fitted to wash hand basin
-
Check waste pipes for leaks
-
Have geysers been fitted with drip trays
-
Check taps & flushmasters
-
Check cisterns for operation
Glazing and painting
-
Does glass thickness comply with safety regulations
-
Are doors fitted with appropriate safety tape etc.
-
Check preparation work to walls before final coats are
applied
-
Is final coat acceptable
-
Has painting been cut-in neatly around doors, frames etc.
-
Are floors clean and free of paint spots
-
Ceiling
-
Have nails heads been primed with undercoat
-
Are ceiling boards correctly nailed to brandering (Nails
150mm apart)
-
Are cornices firmly fixed in position
-
Has all steel work been cleaned and primed
-
Are final coats acceptable
|